BE190-Pro Enabling Smart Energy Park Transformation
Categories

BE190-Pro Enabling Smart Energy Park Transformation

The BE190-Pro edge I/O module enhances smart energy park efficiency by converting protocols, ensuring stability , and enabling real-time fault isolation for reliable energy management.
BE190-Pro Enabling Smart Energy Park Transformation
Case Details
1.Protocol Fragmentation: 6 different communication protocols (Modbus RTU/DL/T645/IEC104, etc.) across 7 equipment brands (Schneider PLCs, ABB inverters, NARI relays, etc.)
2.Harsh Environments: Outdoor PV junction boxes operating at 75°C, substation humidity exceeding 85% RH.
3.Real-Time Requirements: Fault isolation within 200ms to ensure critical load reliability.

Solution: BE190 Edge I/O Modules for Full Coverage

The project deployed BE190Pro multi-protocol edge I/O modules as the core infrastructure, building a three-tier smart architecture:

1. Edge Perception Layer (Direct Device Access)

  • Multi-Protocol Conversion: 4 isolated RS485 ports for simultaneous connectivity to:

    • PV systems (ABB inverter Modbus RTU → IEC104 conversion)

    • Battery storage (BYD BMS CAN protocol → IEC104 conversion)

    • Power distribution (native IEC104 support for NARI protection devices)

  • Industrial Reliability:

    • Passed 85°C continuous operation test (GB/T 2423.2)

    • 2KVrms electrical isolation to withstand substation EMI

2. Regional Aggregation Layer (Logic Control)

  • Edge Computing: BE190Pro modules at 3 energy substations enabled:

    • PV anti-backfeed protection (via Y31 analog input current direction monitoring)

    • Battery SOC balancing (using Y51 RTD module for temperature data)

    • Fault waveform capture (Y95 pulse counting for microgrid frequency analysis)

3. Cloud Management Platform

  • Data Fusion: Dual Ethernet ports transmitted IEC104 data to the energy management platform for:

    • Digital twin visualization (GIS-integrated real-time monitoring)

    • Load forecasting (LSTM neural network trained on historical data)


Key Technical Highlights

Feature Implementation Benefit
Protocol Conversion Built-in IEC104/Modbus/DL/T645 stacks Eliminated 3 protocol gateway devices
Temp Compensation Y51 RTD module for transformer winding temps Extended equipment lifespan by 40%
Pulse Capture Y95 module 50KHz high-speed counting Precise harmonic source localization
Security TLS 1.3 + hardware isolation Achieved Cybersecurity Level 3 certification

Results

  • Operational Efficiency

    • Fault location time reduced from 45 mins to 2 mins

    • Manual inspections decreased by 60%

  • Economic Benefits

    Metric Pre-Upgrade Post-Upgrade Improvement
    PV Curtailment 8.7% 3.2% ↓63%
    ESS Round-Trip Efficiency 89% 93% ↑4.5%
    Peak-Valley Arbitrage ¥2.86M/year ¥4.12M/year ↑44%
  • Environmental Impact

    • Annual CO₂ reduction: 12,000 tons

    • Renewable penetration rate: 68%

Leave a message
FirstName*
LastName*
Email*
Message*
Code*
Verification Code
We use Cookie to improve your online experience. By continuing browsing this website, we assume you agree our use of Cookie.