With the rapid growth of new energy vehicles, charging piles have become core nodes of urban energy infrastructure. Traditional charging piles that only perform the “charging” function can no longer meet the needs of operation platforms for real-time monitoring, remote maintenance, data analytics, and standardized interconnection.
BL340, an intelligent gateway designed specifically for industrial edge scenarios, bridges charging piles and operation platforms efficiently, reliably, and securely with its rich industrial interfaces, high-performance computing power, and open SDK. It is now widely deployed in public charging stations, commercial parking lots, highway service areas, and similar scenarios.
BL340 is optimized for charging pile data acquisition:
After collecting field instrument data via Modbus RTU/TCP or CAN bus, BL340 pushes the data to the cloud platform/operation server in real time using WebSocket or HTTPS protocols, achieving second-level response.
OCPP (Open Charge Point Protocol) is the global standard communication protocol between charging piles and backend operation platforms. BL340 natively supports a Java runtime environment, allowing customers to directly deploy their self-developed OCPP 1.6 / OCPP 2.0.1 server or client programs.
Typical workflow:
No additional industrial PC is required — a single BL340 completes the full “pile-to-platform” protocol docking, significantly reducing system integration cost.
BL340 comes with a lightweight Telegraf agent (from InfluxData) that can collect data from:
Key advantages:
Even if the cloud platform has not yet implemented OCPP, Telegraf enables fast basic data monitoring.
Charging piles are usually deployed outdoors, making on-site maintenance expensive. BL340 pre-installs WireGuard (a modern, high-performance VPN protocol) — only one line of configuration is needed to establish an encrypted tunnel with the maintenance center.
Practical value:
After deploying BL340 across 200 charging stations, one operator achieved the following significant improvements:
With its combination of rich interfaces + high-performance edge computing + open SDK, BL340 perfectly addresses the three major pain points in charging pile scenarios: difficult multi-protocol access, expensive remote maintenance, and data security risks.
Whether for new charging stations or retrofitting existing piles, a single BL340 enables fast OCPP standardization, real-time data acquisition, and secure remote maintenance — helping operators build an efficient, intelligent, and scalable charging network.
If you are planning a charging pile project or looking for an edge gateway replacement solution, feel free to contact us for the complete BL340 technical whitepaper and demo programs. We can also provide a customized one-stop firmware solution integrating OCPP + Telegraf + WireGuard to help you go live faster!